Pre-restoration Work and Backfill Material Delivery on Flower St

September 28 @ 6:00 am - December 28 @ 3:30 pm

Summary

Regional Connector Constructors (RCC) will continue pre-restoration work and material delivery planned for Flower St, between 4th St and 6th St and 6th St between Figueroa and Flower St. Work hours, weather permitting, are 6 am to 3:30 pm, Monday through Friday. Saturday from 6 am to 6 pm. This notice will continue to be updated with additional pre-restoration activities as necessary.

 Essentials

Activities will include traffic control set up, equipment mobilization, curb demo, vent installation, installation of chain link fencing, and delivery of backfill and materials.

 What to Expect

  • Intermittent lane restrictions on southbound Flower St, between 3rd and 5th St.
  • Intermittent lane reductions on 6th St between Figueroa and Flower St.
  • Eastbound 4th St will be reduced to a right turn only during work hours between Figueroa and Flower St.
  • Access to pedestrian walkways and nearby businesses will be maintained outside of the work area.

Details

Start:
September 28 @ 6:00 am
End:
December 28 @ 3:30 pm