2nd/Hope Station Yard Activities

Summary: Regional Connector Constructors (RCC) will continue to perform construction activities at the 2nd/Hope Station Yard. Work is anticipated to continue through 2021. Work hours, weather permitting, are 6am to 9pm, […]

Little Tokyo/Arts District Station Closure

Summary Regional Connector Constructors will permanently close the Little Tokyo/Arts District Station to build the underground tunnel box for the L Line (Gold) along Alameda St, between 1st St and […]

La Cienega Appendage Structures – Wilshire/La Cienega

Summary Beginning in March 2021, work activities at the Wilshire/La Cienega Station will transition to the construction of appendage structures adjacent to the underground station box. These structures house vital systems for the future Wilshire/La Cienega Station, including entrance and exit structures, emergency exits, ventilation rooms, and utility rooms. This work will require various intermittent […]

Westbound 1st St Directional Closure

Regional Connector Constructors (RCC) will implement a directional closure of westbound (WB) 1st St between Vignes St and Alameda St. The 24/7 directional closure is anticipated to be in place until Spring 2022.  This directional closure will allow for the removal of L Line (Gold) tracks, tie-in to the new system, and street restoration. RCC […]

Recurring

Civil improvements & material delivery on Flower St

Summary Regional Connector Constructors (RCC) will continue pre-restoration work and material delivery planned for Flower St, between 3rd St and Wilshire Bl.  RCC will continue civil improvements, sidewalk removal and […]

Appendage Construction – North La Brea Yard – Phase 1.1

Summary  Beginning Monday, August 9, and continuing for approximately seven months, work within the North La Brea Yard will transition to appendage construction for the La Brea Station.  When  Monday, August 9, for approximately 7 months.  Construction activity will occur between 7am and 10pm; clean up activities may take place between 10pm and 12am.  Where  Wilshire Blvd. and La Brea Ave.  Traffic Control  Wilshire Blvd. between Orange Dr. and […]

Recurring

G Line (Orange) Advanced Utility Relocation

Summary On behalf of Metro’s G Line (Orange) BRT Improvements Project, the Los Angeles Department of Water and Power (LADWP) and Charter Spectrum will relocate their respective utility lines as […]

Intermittent Lane and Sidewalk Closures at S. Reeves Dr.

Summary The design-build contractor will implement an intermittent lane and sidewalk closure on S. Reeves Dr. at Wilshire Blvd. to accommodate the delivery of gravel, rebar, and concrete underneath the […]