Westbound 1st St, between Vignes and Alameda St: Bikes prohibited

Summary Due to increasing construction activities for Metro’s Regional Connector Transit Project—including excavation of the 1st St Portal and future removal of the Gold Line tracks across 1st St—westbound 1st St is closed at Vignes St to all bicyclists through the duration of construction. Detour A bike detour is in place on westbound 1st St […]

Recurring

2nd/Hope Station Yard Activities

Summary: Regional Connector Constructors (RCC) will continue to perform construction activities at the 2nd/Hope Station Yard. Work is anticipated to continue through 2021. Work hours, weather permitting, are 6am to 9pm, Monday through Friday, and 5am to 6pm on Saturdays and Sundays as needed.  Essentials: Activities include: installing HDPE waterproofing, rebar installation, plumbing work, electrical conduit […]

Recurring

PLE1: Southwest Fairfax Ave. and Wilshire Blvd. Appendage Work Zone

Summary Through April 15, 2022, Wilshire Blvd. between San Diego Way and Spaulding Ave. will be reduced to two lanes in each direction. Fairfax Ave. will see no traffic impacts; however, a K-Rail work zone will be implemented on the southwest corner of Wilshire and Fairfax (shown on the map below.) This traffic control supports appendage construction immediately adjacent to the Wilshire/Fairfax Station.  Essentials WHEN August 8, 24 hours per […]

Little Tokyo/Arts District Station Closure

Summary Regional Connector Constructors will permanently close the Little Tokyo/Arts District Station to build the underground tunnel box for the L Line (Gold) along Alameda St, between 1st St and the 101 Santa Ana Freeway. Lane reductions are expected on this stretch of Alameda St to allow for the safe demolition of the station and […]

Parking Shuttle Service for West LA VA Hospital Campus

Parking Shuttle Service is now available for hospital staff and guests of the West LA VA Hospital campus. The shuttle service, which is free to staff and guests, will operate while construction work is underway in several parking structures and lots on the hospital campus. When: Fall 2020 through Fall 2023 Hours:  Monday through Friday; 24 […]

La Cienega Appendage Structures – Wilshire/La Cienega

Summary Beginning in March 2021, work activities at the Wilshire/La Cienega Station will transition to the construction of appendage structures adjacent to the underground station box. These structures house vital systems for the future Wilshire/La Cienega Station, including entrance and exit structures, emergency exits, ventilation rooms, and utility rooms. This work will require various intermittent […]

Recurring

PLE2: Installation of Instrumentation Poles along Tunnel Alignment

Summary The design-build contractor is continuing with the installation of geotechnical instruments along the tunnel alignment from Century City to Wilshire Blvd. and La Cienega Blvd. in Beverly Hills. Ten-foot poles with geotechnical instruments will be temporarily installed on public sidewalks within this area in order to monitor ground movement, settlement, and other geological impacts during […]

Westbound 1st St Directional Closure

Summary Regional Connector Constructors (RCC) will implement a directional closure of westbound (WB) 1st St between Vignes St and Alameda St. The 24/7 directional closure is anticipated to be in place until Spring 2022.  This directional closure will allow for the removal of L Line (Gold) tracks, tie-in to the new system, and street restoration. […]

Recurring

Civil improvements & material delivery on Flower St

Summary Regional Connector Constructors (RCC) will continue pre-restoration work and material delivery planned for Flower St, between 3rd St and Wilshire Bl.  RCC will continue civil improvements, sidewalk removal and restoration at the Flower St intersections on 3rd St and 4th St. RCC will also begin sidewalk restoration on Flower St between 4th St and […]

Recurring

1st St/Central Av, 1st St and the Mangrove Yards Construction Activities

Summary Regional Connector Constructors (RCC) will continue to perform construction activities at the future Little Tokyo/Arts District Station, 1st St Portal construction (between Hewitt and Alameda), and the Mangrove yard (1st/Temple St) to support ongoing construction and tunneling operations. Work is anticipated to continue through 2022. Anticipated work hours, weather permitting, are from 4 am […]

Appendage Construction – North La Brea Yard – Phase 1.1

Summary  Beginning Monday, August 9, and continuing for approximately seven months, work within the North La Brea Yard will transition to appendage construction for the La Brea Station.  When  Monday, August 9, for approximately 7 months.  Construction activity will occur between 7am and 10pm; clean up activities may take place between 10pm and 12am.  Where  Wilshire Blvd. and La Brea Ave.  Traffic Control  Wilshire Blvd. between Orange Dr. and […]

Recurring

PLE3: West LA VA Hospital Campus Worksite Activities

West LA VA Hospital Campus Worksite Activities  Summary  Metro contractors will continue worksite preparation for the future Westwood/VA Hospital Station. Work includes well monitoring, instrumentation, tree relocation, utility relocation (storm drain, gas line and sewer capping), flagpole removal and storage, hauling of spoil materials, construction wall installation and other improvement activities to create the staging […]