Home > Projects & Programs > Wilshire Bus Rapid ... > Revised Wilshire BRT Final EIR/EA ...
Viewing Tip: Some sections are large and may take longer to download. Right-clicking on desired link and using the "Save target as" option may speed-up the download time.
Notice of Availability
Revised Wilshire BRT Final EIR/EA
Table of Contents (94KB)
Executive Summary (660KB)
Chapter 1: Introduction (1MB)
Chapter 2: List of Commenters (69KB)
Chapter 3: Responses to Comments (267KB)
Chapter 4: CEQA Environmental Analysis of the Proposed Project (31KB)
Chapter 5: CEQA Environmental Analysis of the Project Alternatives (584KB)
Chapter 6: Other CEQA Considerations (91KB)
Chapter 7: NEPA Environmental Assessment (462KB)
Chapter 8: Mitigation Monitoring and Reporting Program (48KB)
Chapter 9: List of Preparers (23KB)
Appendix A: Responses to Comments
Appendix B: Revised Appendices to the Draft EIR/EA
Appendix A – Notice of Preparation (NOP), and NOP Response Letters
- Part 1 of 5 (3.9MB)
- Part 2 of 5 (3.8MB)
- Part 3 of 5 (3.6MB)
- Part 4 of 5 (2.5MB)
- Part 5 of 5 (3MB)
Appendix B – Traffic Study
- Part 1 of 4 (7.3MB)
- Part 2 of 4 (7.2MB)
- Part 3 of 4 (3.3MB)
- Part 4 of 4 (5.8MB)
Appendix C – Air Quality Assessment Report (4.5MB)
Appendix D – Architectural Resource Technical Study
- Part 1 of 2 (5MB)
- Part 2 of 2 (8.3MB)
Appendix E – Archaeological Resources Technical Study (1.8MB)
Appendix F – Noise Spreadsheets (316KB)
Appendix G – Community Impact Assessment (1.3MB)
Project Team:
Martha Butler, Project Manager
Contact Information:
Metro
One Gateway Plaza
Los Angeles, CA 90012-2952
Tel:
213.922.2500
Online:
Comment/Question Form
Email:
Wilshirebrt@metro.net
Please be sure to include all of your contact information in the body of your e-mail.