Home > Projects & Programs > Purple Line Extension > Westside Subway Extension of the ...
Metro is requesting Statements of Qualifications from Respondents (RFQ) for the Westside Subway Extension of the Metro Purple Line Project Section 1 Contract for design-build delivery. The Contract is for design and construction of a heavy rail transit subway extension of the existing Purple Line from its current terminus at Wilshire/Western Station to a new Wilshire/La Cienega station. The extension will be approximately 3.9 miles and will include a total of three (3) new stations: Wilshire/La Brea, Wilshire/Fairfax, and Wilshire/La Cienega. The Section 1 alignment travels westerly beneath Wilshire Bl to the Wilshire/La Cienega Station. More information is available at this link.
Click here if you have additional questions or call Zach Munoz at (213) 922-7301.
Prior to the release of the RFQ, Metro invited industry and potential prime contractors to review and discuss specific technical comments on the Westside Subway Extension of the Metro Purple Line. A meeting was held on October 10th and comments were due by October 30, 2012.
October 10, 2012 Industry Constructability Review Meeting Information:
Click here to if you have additional questions or call Eva Rodriguez at 213-922-1034.
Comments may be submitted by:
Online: Complete our electronic Comment/Question Form
By U.S. Mail:
David Mieger, Project Director
DEO, Countywide Planning & Development
Los Angeles Metropolitan Transportation Authority
1 Gateway Plaza, M/S 99-22-5
Los Angeles, CA 90012
Tel: 213.922.6934
Phone messages are retrieved at least once every business day.
purplelineext@metro.net
Please be sure to include all of your contact information in the body of your e-mail.
Join our growing Facebook page. Find us at: https://www.facebook.com/purplelineext
Follow us on Twitter: https://twitter.com/purplelineext
For viewing MS Word, Powerpoint, and Excel documents - Download Adobe Acrobat Reader (free) or use Google Docs Reader (online)