Home > Projects & Programs > Purple Line Extension > Final EIS/EIR


Final EIS/EIR


A compact disc (DVD) containing the complete report is also available. Provide your information here.

Viewing Tip: Some sections are large and may take longer to download. Right-clicking on desired link and using the "Save target as" option may speed-up the download time.

Final EIS/EIR

Appendices

Technical Reports, Addenda and Memorandums Prepared for and/or Referenced in Final EIS/EIR

Stay Connected
Receive email alerts and follow on the web.
  • Get e-mail updates
  • Get updates at facebook.com/purplelineext
  • Get updates at twitter.com/purplelineext
  • Get updates at http://www.ustream.tv/channel/westsidesubway






Comments may be submitted by:

Online: Complete our electronic Comment/Question Form

By U.S. Mail:
David Mieger, Project Director
DEO, Countywide Planning & Development
Los Angeles Metropolitan Transportation Authority
1 Gateway Plaza, M/S 99-22-5
Los Angeles, CA 90012

Tel: 213.922.6934
Phone messages are retrieved at least once every business day.

purplelineext@metro.net
Please be sure to include all of your contact information in the body of your e-mail.

Join our growing Facebook page. Find us at: https://www.facebook.com/purplelineext 

Follow us on Twitter: https://twitter.com/purplelineext





For viewing MS Word, Powerpoint, and Excel documents - Download Adobe Acrobat Reader (free) or use Google Docs Reader (online)

TRANSIT INFO: 323.GO.METRO (323.466.3876) STAY CONNECTED: