Home > Projects & Programs > Purple Line Extension > Field Work Archive


Field Work Archive


Field Work

Get more updates on Twitter/WestsideSubway

Date/Time Location Notice Brief Detail
February 28
- March 4

9am to 3:30pm
City of Los Angeles (Westwood Area) Work to be performed will consist of three (3) different types of testing, see notice for details. HTML
PDF
February 28
- March 4

9am - 3:30pm
City of Los Angeles (Century City) During this next part of testing the work performed will consist of three (3) different types of testing, see notice for details. HTML
PDF
February 28
- March 4

9am - 3pm
City of Los Angeles (Miracle Mile to Koreatown) Metro contractors will conduct work to locate and identify underground utilities along the following locations:
  • Wilshire Bl between La Jolla Av and Hauser Bl
  • Wilshire Bl between Rossmore Av and Western Av
HTML
PDF

February 21 - 25
9am - 3:00pm
(weekdays only)

February 21
-
March 4
9am - 3:30pm
(weekdays only)

City of Los Angeles (Century City) February 21 – 25 Metro contractors will conduct work to locate and identify underground utilities along Century Park West between Santa Monica Bl and Constellation Bl.

During this next part of testing the work performed will consist of two (2) different types of testing. Weather permitting, testing will also be performed February 21 – March 4; 9am – 3:30pm (weekdays only), see notice for locations.
HTML
PDF
February 21
9am - 2:30pm

February 21
- March 1

9am - 3:30pm
(weekdays only)
City of Los Angeles (Westwood Area) February 21 from 9am – 2:30pm Metro contractors will conduct work to locate and identify underground utilities at the following locations on Fox Hills Dr and Missouri Av.

Additional work to be work performed will consist of two (2) different types of testing and, weather permitting, will be performed February 21 – March 1; 9am – 3:30pm (weekdays only), see notice for locations.
HTML
PDF
February 19 & 20

February 26 & 27

March 5 & 6
Beverly Hills High School Metro contractors will conduct a series of geotechnical fieldwork tests as a part of the Final EIS/EIR, see notice for details. HTML
PDF
February 14 - 18
9:30am-2:30pm
City of Beverly Hills Metro contractors will conduct two (2) different types of testing, see notice for details.

HTML
PDF

February 11-22
9am-3pm
(weekdays only)
City of Los Angeles (Westwood Area) Metro contractors will conduct two (2) different types of testing, see notice for details. HTML
PDF
February 11 - 18
9am – 3:30pm
(weekdays only)
City of Los Angeles (Century City) Metro contractors will conduct two (2) different types of testing, see notice for details. HTML
PDF
February 7 - 14
9am - 3pm
(weekdays only)
City of Los Angeles (Westwood Area) Metro contractors will conduct two (2) different types of testing, see notice for details. HTML
PDF
February 7 - 14
9am – 3:30pm
(weekdays only)
City of Los Angeles (Century City) Metro contractors will conduct two (2) different types of testing, see notice for details. HTML
PDF
February 7 - 11
9:30am - 2:30pm
City of Beverly Hills Metro contractors will conduct two (2) different types of testing, see notice for details. HTML
PDF
January 31 - February 8
9am-2:30pm
City of Beverly Hills Metro contractors will conduct three (3) different types of testing, see notice for details and locations. HTML
PDF
January 31 – February 4
9am – 3:30pm
City of Los Angeles (Century City) Metro contractors will conduct work two (2) different types of testing, see notice for details. HTML
PDF
January 24
9am-2:30pm
City of Beverly Hills Metro contractors will conduct work to locate and identify underground utilities at various locations, see notice for details. HTML
PDF
January 17 – 24
9am-3:30pm
City of Los Angeles
(Century City)
During this next part of testing the work performed will consist of three (3) different types of testing. HTML
PDF
January 17 – 25
9am-4pm
City of Beverly Hills During this next part of testing the work performed will consist of three (3) different types of testing. HTML
PDF
January 17 – 25
9am-3pm
City of Los Angeles (Westwood Area) The rotary-wash borings will be drilled to obtain soil samples for testing and evaluation, and at some locations to install soil gas monitoring wells. HTML
PDF
January 10 – 14
9am-3:30pm

January 12 – 18
9am-3:30pm

January 13 – 18
9am-3:30pm
City of Los Angeles (Century City) During this next part of testing the work performed will consist of three (3) different types of testing. HTML
PDF
January 4-7
9am-4pm

January 7-11
9am-4pm
City of Beverly Hills The next part of the work to be performed will consist of field seismic testing. The field seismic testing will be performed using several pieces of equipment to collect seismic reflection data. HTML
PDF
2010
December 27-30
9am-3pm
City of Los Angeles (Westwood Area) The upcoming work will consist of borings to assess soil conditions in the area. HTML
PDF
December 27-28
9am-3pm
City of Los Angeles (Westwood Area) Crews will conduct Cone Penetrometer Testing (CPT) that will consist of a truck which advances a steel cone tip into the ground by pushing an approximately one-inch diameter steel rod attached to the cone tip. HTML
PDF
December 13–17
9am-3pm
City of Los Angeles
(Westwood Area)
The upcoming work will consist of borings to assess soil conditions in the area. Work will be conducted using a truck-mounted rig with a crew of up to four people. The drill bit will be advanced to the anticipated tunnel depths in the area, or greater. HTML
PDF

Field Work Notices

Stay Connected
Receive email alerts and follow on the web.
  • Get e-mail updates
  • Get updates at facebook.com/purplelineext
  • Get updates at twitter.com/purplelineext
  • Get updates at http://www.ustream.tv/channel/westsidesubway






Comments may be submitted by:

Online: Complete our electronic Comment/Question Form

By U.S. Mail:
David Mieger, Project Director
DEO, Countywide Planning & Development
Los Angeles Metropolitan Transportation Authority
1 Gateway Plaza, M/S 99-22-5
Los Angeles, CA 90012

Tel: 213.922.6934
Phone messages are retrieved at least once every business day.

purplelineext@metro.net
Please be sure to include all of your contact information in the body of your e-mail.

Join our growing Facebook page. Find us at: https://www.facebook.com/purplelineext 

Follow us on Twitter: https://twitter.com/purplelineext





For viewing MS Word, Powerpoint, and Excel documents - Download Adobe Acrobat Reader (free) or use Google Docs Reader (online)

TRANSIT INFO: 323.GO.METRO (323.466.3876) STAY CONNECTED: