Home > Projects, Programs and Plans > Sepulveda Pass Corridor > Final Compendium Report, November 2012

Final Compendium Report, November 2012

Title Page and Preface

Executive Summary

Study Findings and Conclusions
Next Steps

Mobility Problem Definition [ Part 1 | Part 2 ]

  1. Introduction
  2. Background
  3. Approach
  4. Proposed Study Corridor Boundaries
  5. Demographic Context
  6. Travel Markets & Characteristics
  7. Topography, Land Use & Activity Centers
  8. Existing Transportation Facilities
  9. Planned Transportation Facilities
  10. Freeway Mainline Performance
  11. HOV Performance
  12. Transit System Performance
  13. Air Quality/Non-Conformity
  14. Key Findings and Conclusions

Potential Ridership/Usage of Alternative Concepts Report

  1. Introduction
  2. Concepts Under Evaluation
  3. Travel Demand Methodology
  4. Travel Demand Results
  5. Key Performance Indicators
  6. Conclusions
  7. Next Steps
    Appendix

Engineering Issues Report

[ Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6
Part 7 | Part 8 | Part 9 | Part 10 | Part 11 ]

  1. Introduction
  2. Corridor System Concepts
  3. Next Steps
    Appendix 1: Conceptual Drawings
    Appendix 2: Higher Speed Buses

Preliminary Cost Report

  1. Introduction
  2. Sources of Cost Data
  3. Rough Order of Magnitude (ROM) Cost Estimates
  4. Rough Order of Magnitude Capital Cost Summary
    Appendix 1 – Draft Guideway Technology Alternatives for Charrette One Sepulveda Pass Systems Planning Corridor Study
    Appendix 2 – Concept #5 Aerial Viaduct Preliminary Cost
    Appendix 3 – Initial Operating Segment

Appendix A - Environmental Issues Technical Paper

[ Part 1 | Part 2 | Part 3 ]

  1. Introduction
  2. Background Information
  3. Systems Concepts and Physical Improvements
  4. Environmental Challenges
  5. Next Steps

Appendix B - Geotechnical Evaluation Memorandum

[ Part 1 | Part 2 | Part 3 | Part 4 ]
[ Part 5 | Part 6 | Part 7 ]

  1. Introduction
  2. Data Collection and Literature Review
  3. Regional Geology
  4. Faulting and Seismicity
  5. Geologic and Seismic Hazards
  6. Geotechnical Evaluations
  7. Discussions and Conclusions
  8. Limitations
  9. References

Appendix C - Summary Notes for Charrettes #1 and #2

Appendix D - June 20, 2012 Staff Report

List of Preparers