| Project Name & Description | Funding | Status |
|---|---|---|
|
Exposition Transit Corridor, Phase II Extends the Exposition Rail Line, currently under construction to Culver City, to Santa Monica. Region(s): City of Los Angeles, Westside citiesCity: Los Angeles More: Project Website |
$925M |
Construction
|
|
Regional Connector: Transit Corridor* Links four light rail lines that terminate at the edges of Central LA. Expected to provide seamless connections between Long Beach/Claremont, and Culver City/East LA, minimizing the need for rail transfers. Region(s): City of Los Angeles, Gateway Cities, San Gabriel Valley, South Bay cities, Westside citiesMore: Project Website |
$160M |
Preliminary Engineering
|
|
Westside Subway Extension (to be opened in segments) Extends Metro Rail to the Westside. The project is expected to serve Century City and Westwood/UCLA. Region(s): City of Los Angeles, Westside citiesMore: Project Website |
$4.07B |
Final Design
|
Here's how it works: The Measure R Projects Tracker lists the various projects in alphabetical order by category with a brief description of the project.1 You can view the status for many of the projects with estimated Measure R funding allocations as projected over 30 years.2
Filter through the various Measure R projects by clicking a criteria on the right. You can filter by project type or region. Project funding is represented in millions (M) or billions (B) of dollars.
For viewing MS Word, Powerpoint, and Excel documents - Download Adobe Acrobat Reader (free) or use Google Docs Reader (online)