Home > Projects & Programs > Measure R > Measure R Project Tracker

Measure R Project Tracker

Project Name & Description Funding Status

Eastside Transit Corridor Phase 2

Extends Metro Gold Line farther east from the Pomona/Atlantic Station.

Region(s): Gateway Cities, San Gabriel Valley
More: Project Website
$1.27B MIS/EIR/EIS/EA Draft Phase

Gold Line Foothill Extension

Extends the Metro Gold Line from its current terminus in Pasadena toward Claremont.

Region(s): San Gabriel Valley
More: Project Website
$735M Construction

Regional Connector: Transit Corridor*

Links four light rail lines that terminate at the edges of Central LA. Expected to provide seamless connections between Long Beach/Claremont, and Culver City/East LA, minimizing the need for rail transfers.

Region(s): City of Los Angeles, Gateway Cities, San Gabriel Valley, South Bay cities, Westside cities
More: Project Website
$160M Preliminary Engineering

SR-710 Project Gap Closure***

Improvements to connection between SR-710 and I-210 freeways.

Region(s): San Gabriel Valley
$$780 million MIS/EIR/EIS/EA Draft Phase

Alameda Corridor East Grade Separations Phase II

Constructs bridges or underpasses and improves the operation of other railroad intersections along a 35-mile stretch of the San Gabriel Valley.

Region(s): San Gabriel Valley
$400M Final Design



Here's how it works: The Measure R Projects Tracker lists the various projects in alphabetical order by category with a brief description of the project.1 You can view the status for many of the projects with estimated Measure R funding allocations as projected over 30 years.2


  • *Specific mode and routing will be subject to approved plans developed in cooperation with local jurisdictions and affected communities.
  • **Specific improvements are expected to be developed by local jurisdictions.
  • ***Partial funding by public/private partnerships is assumed to be part of the project plan.

1Projects listed are for reference only and do not indicate priority order. Project definition depends on final environmental process.
2Measure R does not fully fund all projects.

For viewing MS Word, Powerpoint, and Excel documents - Download Adobe Acrobat Reader (free) or use Google Docs Reader (online)