| Project Name & Description | Funding | Status |
|---|---|---|
|
Eastside Transit Corridor Phase 2 Extends Metro Gold Line farther east from the Pomona/Atlantic Station. Region(s): Gateway Cities, San Gabriel ValleyMore: Project Website |
$1.27B |
MIS/EIR/EIS/EA Draft Phase
|
|
Gold Line Foothill Extension Extends the Metro Gold Line from its current terminus in Pasadena toward Claremont. Region(s): San Gabriel ValleyMore: Project Website |
$735M |
Construction
|
|
Regional Connector: Transit Corridor* Links four light rail lines that terminate at the edges of Central LA. Expected to provide seamless connections between Long Beach/Claremont, and Culver City/East LA, minimizing the need for rail transfers. Region(s): City of Los Angeles, Gateway Cities, San Gabriel Valley, South Bay cities, Westside citiesMore: Project Website |
$160M |
Preliminary Engineering
Advanced Conceptual Engineering/Preliminary Engineering
|
|
SR-710 Project Gap Closure*** Improvements to connection between SR-710 and I-210 freeways. Region(s): San Gabriel Valley |
$780M |
Initial Planning
|
|
Alameda Corridor East Grade Separations Phase II Constructs bridges or underpasses and improves the operation of other railroad intersections along a 35-mile stretch of the San Gabriel Valley. Region(s): San Gabriel Valley |
$400M |
Final Design
|
Here's how it works: The Measure R Projects Tracker lists the various projects in alphabetical order by category with a brief description of the project.1 You can view the status for many of the projects with estimated Measure R funding allocations as projected over 30 years.2
Filter through the various Measure R projects by clicking a criteria on the right. You can filter by project type or region. Project funding is represented in millions (M) or billions (B) of dollars.