| Project Name & Description | Funding | Status |
|---|---|---|
|
Eastside Transit Corridor Phase 2 Extends Metro Gold Line farther east from the Pomona/Atlantic Station. Region(s): Gateway Cities, San Gabriel ValleyMore: Project Website |
$1.27B |
MIS/EIR/EIS/EA Draft Phase
|
|
Gold Line Foothill Extension Extends the Metro Gold Line from its current terminus in Pasadena toward Claremont. Region(s): San Gabriel ValleyMore: Project Website |
$735M |
Construction
|
|
Regional Connector: Transit Corridor* Links four light rail lines that terminate at the edges of Central LA. Expected to provide seamless connections between Long Beach/Claremont, and Culver City/East LA, minimizing the need for rail transfers. Region(s): City of Los Angeles, Gateway Cities, San Gabriel Valley, South Bay cities, Westside citiesMore: Project Website |
$160M |
Preliminary Engineering
|
|
SR-710 Project Gap Closure*** Improvements to connection between SR-710 and I-210 freeways. Region(s): San Gabriel Valley |
$780M |
Alternatives Analysis Study
|
|
Alameda Corridor East Grade Separations Phase II Constructs bridges or underpasses and improves the operation of other railroad intersections along a 35-mile stretch of the San Gabriel Valley. Region(s): San Gabriel Valley |
$400M |
Final Design
|
Here's how it works: The Measure R Projects Tracker lists the various projects in alphabetical order by category with a brief description of the project.1 You can view the status for many of the projects with estimated Measure R funding allocations as projected over 30 years.2
Filter through the various Measure R projects by clicking a criteria on the right. You can filter by project type or region. Project funding is represented in millions (M) or billions (B) of dollars.
For viewing MS Word, Powerpoint, and Excel documents - Download Adobe Acrobat Reader (free) or use Google Docs Reader (online)