| Project Name & Description | Funding | Status |
|---|---|---|
|
I-5/SR-134 TSM Project SR-2 to Hollywood Way Incl. Ramp Meters, CCTV, CMS TBD Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Glendale |
$TBD |
Ongoing
|
|
SR-134/Brand Bl Westbound Offramp Widening TBD Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Glendale |
$TBD |
Ongoing
|
|
Fairmont Av Grade Separation at San Fernando Road Provides grade separation of Fairmont Av over San Fernando Road and includes construction of a Park-and-Ride facility. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Glendale |
$3M |
Construction
|
|
I-5 Corridor Arterial Signal Improvements Provide traffic signal upgrades, signal controller upgrades, and variable timing plans to intersections on arterial streets within 1 mile of the I-5 corridor. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Burbank |
$TBD |
Ongoing
|
|
I-5 HOV from SR-134 to SR-170 Constructs one carpool lane in each direction along the I-5 freeway between SR-134/SR-170, including access improvement for Empire Av. Region(s): Arroyo Verdugo, City of Los Angeles |
$272M |
Construction
|
|
I-5/Olive Av - Verdugo Av Northbound Ramps Auxiliary Lane Reconfigure the existing Northbound Olive Av ramp system with I-5 to provide a continuous auxiliary lane between Alameda Av and Burbank Bl, by reconfiguring Bonnywood Place and the existing ramps at Angeleno and Orange Grove. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Burbank |
$TBD |
Ongoing
|
|
Monterey Road Extension to Glenoaks Bl over Verdugo Wash Construction of a bridge to connect Monterey Road to Glenoaks Bl. This project would create a continuous frontage road to connect the existing SR-134/Central/Brand Bl split-diamond interchange to the SR-134/Glendale Av interchange. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Glendale |
$TBD |
Ongoing
|
|
San Fernando Bl/Burbank Bl Intersection Improvement Widen San Fernando/Burbank intersection to improve intersection operations. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Burbank |
$8M |
Initial Planning
|
|
San Fernando/Grandview At-Grade Rail Crossing Improvements Safety improvements to the existing at-grade rail crossing at San Fernando Road and Grandview Av. The improvements include the installation of a state-of-the-art advance pre-emption system, installation of quad gates, and adjustment of the roadway approach grade at the railroad track. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Glendale |
$2.2M |
Construction
|
|
Sonora Av At-Grade Rail Crossing Safety Upgrade Safety improvements to the existing at-grade rail crossing at Sonora Av. The improvements include the installation of a state-of-the-art advance pre-emption system, installation of quad gates, and adjustment of the roadway approach grade at the railroad track. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Glendale |
$2,700 |
Construction
|
|
SR-134 Corridor Arterial Signal Improvements Provide traffic signal upgrades, signal controller upgrades, and variable timing plans to intersections on arterial streets within 1 mile of the SR-134 corridor. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Burbank |
$TBD |
Ongoing
|
|
SR-134 Ramps/Harvey Dr/Wilson Av Signal & Street Widening Upgrading the traffic signal at the SR-134 Eastbound and Westbound on and off ramps with Harvey Dr, upgrading the traffic signal at this intersection, and widening the Harvey Dr and Wilson Av intersection. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Glendale |
$1.1M |
Ongoing
|
|
SR-134/Central Av Eastbound Offramp Widening Add an additional lane to the SR-134 Eastbound off-ramp at Central Av to alleviate traffic back up on Central Av off-ramp, SR-134 eastbound auxiliary lane, and freeway main line. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Glendale |
$3.5M |
Ongoing
|
|
SR-134/Glendale Av Interchange Modification Upgrading the traffic signal at the SR-134 Eastbound on and off ramps and Glendale Av, upgrading the traffic signal at Glendale Av and Monterey Road and adding a left turn lane, and installation of interconnect cable for the westbound on-ramp and westbound off-ramp. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Glendale |
$3M |
Ongoing
|
|
SR-134/Pacific Av Eastbound Offramp Widening Add an additional lane to the SR-134 Eastbound off-ramp at Pacific Av to alleviate traffic back up on the Pacific Av off-ramp and freeway main line. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Glendale |
$0.3M |
Ongoing
|
|
SR-134/Pacific Av Westbound Offramp Widening Add an additional lane to the SR-134 Westbound off-ramp at Pacific Av to alleviate traffic back up on the Pacific Av off-ramp and freeway main line. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Glendale |
$0.3M |
Ongoing
|
|
SR-2/Holly Dr Interchange Ramp Signalization Installation of a traffic signal at the intersection of Holly Dr and the SR-2 Freeway on and off ramps. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Glendale |
$.5M |
Ongoing
|
|
SR-2/Mountain Av Interchange Ramp Widening Widening the Northbound and Southbound off-ramps at the Mountain Av interchange with SR-2. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Glendale |
$.6M |
Ongoing
|
|
SR-2/SR-134 Interchange Fwy-to-Fwy Ramp Meters Installation of Ramp Metering on the SR-2 Southbound to SR-134 Westbound connector ramp. Also includes the installation of Ramp metering on the SR-134 to SR-2 Northbound connector ramp. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Glendale |
$3M |
Ongoing
|
|
SR-2/Verdugo Bl Intersection Signalization Installation of a traffic signal at the SR-2 / Verdugo Bl on ramp. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Glendale |
$700 |
Ongoing
|
|
Widen Magnolia Bl/I-5 Bridge for center-turn lane, standard lanes, shoulders Widen Magnolia Bridge over I-5 to provide standard-width travel lanes, a continuous two-way left turn lane to serve both sides of the bridge, five-foot shoulders, and widened sidewalks. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Burbank |
$2.3M |
Ongoing
|
|
Widen Olive Av/I-5 Bridge for center-turn lane, standard width lanes, shoulders Widen Olive Av Bridge over I-5 to provide standard-width travel lanes, a continuous two-way left turn lane to serve both sides of the bridge, five-foot shoulders, and widened sidewalks. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: Burbank |
$TBD |
Ongoing
|
|
Soundwalls on I-210 Design and construct certain soundwall segments along the I-210 freeway within the City of La Cañada Flintridge. Part of the Highway Operational Improvements in Arroyo Verdugo Subregion Region(s): Arroyo VerdugoCity: La CaƱada Flintridge |
$4.588M |
Initial Planning
|
Here's how it works: The Measure R Projects Tracker lists the various projects in alphabetical order by category with a brief description of the project.1 You can view the status for many of the projects with estimated Measure R funding allocations as projected over 30 years.2
Filter through the various Measure R projects by clicking a criteria on the right. You can filter by project type or region. Project funding is represented in millions (M) or billions (B) of dollars.