Home > Projects & Programs > Construction Notices
| Date | Notice Brief | Detail |
|---|---|---|
|
April 23 |
In preparation for the grand opening of the Metro Orange Line Extension, Metro is preparing to start Systems Testing along the Orange Line Extension. During this testing period, buses will intermittently run along the busway for testing purposes only. Please be advised that construction work will continue during this testing period. |
HTML |
|
April 21 |
The Contractor continues to work on Metro Orange Line Extension Project. As part of this work the Contractor will be installing the duct bank across the intersection of Marilla St and Owensmouth Av. |
HTML |
|
April 21 |
El Contratista continúa trabajando en la Extensión del Metro Orange Line. Como parte de este trabajo, el contratista va a instalar conductos eléctricos en la intersección de la calle Marilla y la avenida Owensmouth. |
HTML |
|
April 16 |
The City of Los Angeles, Department of Public Works, and Bureau of Street Services will begin roadway improvements along Canoga Av. The project will require the preparation of the existing roadway by one of the following initial phases: grinding the street, full depth removals and repairing of failed areas of the street, or reconstruction of the existing roadway. The final phase is resurfacing the street. The work will be scheduled so that the project will be completed within three weeks, provided no extenuating circumstances. |
HTML |
|
April 14 |
The Contractor continues to work on Metro Orange Line Extension Project. As part of this work the Contractor will be installing the duct bank on Marilla St from Canoga Av to Owensmouth Av. |
HTML |
|
April 07 |
As part of the continuing construction activities for the Metro Orange Line Extension, the Contractor will be implementing continuous street closures for the final grind and overlay (street paving). To accommodate this work the Contractor will implement full street closures at the intersection of Canoga Av/ Sherman Way and along Canoga Av from Plummer St. to Marilla St. |
HTML |
|
April 07 |
Como parte de las actividades de construcción que continúan en la extensión del Metro Orange Line, el Contratista implementará cierres continuos de las calles para la última etapa de pulir y cubrir la calle (pavimentación de la calle). |
HTML |
|
March 30 |
As part of the continuing construction activities for the Metro Orange Line Extension, the Contractor will be implementing continuous street closures for the final grind and overlay (street paving). To accommodate this work the Contractor will implement full street closures at the intersections of Canoga Av/Vanowen St., Canoga Av/ Sherman Way, and Canoga Av/Prairie St. |
HTML |
|
March 27 |
As part of the continuing construction activities for the Metro Orange Line Extension Project, Metrolink’s Contractor will be cutting loops for new gate censors and placing foundations for new railroad crossing and pedestrian gates. To accommodate the work, Metro’s Contractor will be closing Lassen Street and the work will be performed at night. |
HTML |
|
March 23 |
As part of the continuing construction activities for the Metro Orange Line Extension, the Contractor will be implementing continuous street closures for the final grind and overlay (paving of the street). To accommodate this work the Contractor will implement full street closures at the intersections of Canoga Av/Vanowen St., Canoga Av/Valerio St., Canoga Av/Roscoe Bl., and Canoga Av/Nordhoff St. The closure will affect traffic traveling along Canoga Av. |
HTML |
|
March 12 |
The Contractor will begin to work on the final stage of utility work on Lassen St. To accommodate the installation of the storm drain on Lassen Street, the Contractor will close the number one lane for westbound Lassen St. |
HTML |
|
March 12 |
El Contratista de Metro empezará la última etapa de trabajo de utilidad sobre la Calle Lassen. Para dar cabida a la instalación del drenaje pluvial en la calle Lassen, el Contratista cerrará el carril numero uno con rumbo al oeste de la calle Lassen. |
HTML |
|
March 09 |
As part of the continuing construction activities for the Metro Orange Line Extension, the Contractor will be implementing continuous street closures for the final grind and overlay (paving of the street). To accommodate this work the Contractor will implement full street closures at the intersections of Canoga Av/Valerio St., Canoga Av/Saticoy St., and Canoga Av/Parthenia St. The closure will affect traffic traveling along Canoga Ave. |
HTML |
|
March 05 |
Metro's Contractor continues to work on the construction of the Lassen Street Overcrossing. In support of these activities, the Contractor will be removing the temporary bridge framework. |
HTML |
|
March 02 |
As part of the continuing construction activities for the Metro Orange Line Extension, the Contractor will be implementing continuous street closures for the final grind and overlay (paving of the street). |
HTML |
|
March 02 |
Como parte de la continuación de construcción de la extensión del Metro Orange Line, el Contratista implementara cierres continuos de las calles para pulir y cubrir la calle (pavimentación de la calle). |
HTML |
|
February 24 |
Como parte de la continuación de construcción de la extensión del Metro Orange Line, el Contratista implementara cierres continuos de las calles para pulir y cubrir la calle (pavimentación de la calle). Para disminuir los impactos de la construcción a la comunidad, el cierre de la calle será implementado durante las horas de la noche. Las primeras intersecciones a ser allanadas serán la calle Parthenia entre las avenidas Canoga y Canoga este, y la calle Saticoy entre las avenidas Canoga y Deering. El cierre afectará tráfico viajando norte a lo largo de Canoga ave. |
HTML |
|
February 24 |
As part of the continuing construction activities for the Metro Orange Line Extension, the Contractor will be implementing continuous street closures for the final grind and overlay (paving of the street). To minimize construction impacts to the community, the closures will be implemented during night hours. The first intersections to be paved will be Parthenia St from Canoga Av. to East Canoga Av. and Saticoy St. from Canoga Ave to Deering Av. The closure will affect traffic traveling north along Canoga Ave. |
HTML |
|
February 24 |
As part of the continuing construction activities for the Metro Orange Line Extension, the Contractor will be reconstructing the Bus Rapid Transit crossing on Vanowen St. just east of Canoga Av. As part of this activity the Contractor will remove the asphalt and place new Portland Cement Concrete and new asphalt concrete pavement on Vanowen St. The closure will not affect north-south traffic along Canoga Av. |
HTML |
|
February 24 |
Como parte de la continuación de construcción de la extensión de Metro Orange Line, el Contratista reconstruirá el cruce de Bus Rapid Transit en la calle Vanowen justo al este de la avenida Canoga. Como parte de esta actividad el Contratista eliminará el asfalto y colocará nuevo concreto de cemento Portland y nuevo pavimento de hormigón de asfalto en la calle Vanowen. El cierre no afectará al tráfico en dirección norte o sur a lo largo de la avenida Canoga. |
HTML |
|
October 28 |
The construction notice is regarding the south parking lot located at the Chatsworth Metrolink Station will be used as a construction staging area beginning Thursday, October 28, 2010. Parking is available on the north parking lot of the station. |
HTML |
|
October 28 |
Esta notificación es con respecto al aparcamiento ubicado al sur de la estación Chatsworth Metrolink que se utilizará como un área de ensayo de construcción empezando el jueves, 28 de octubre de 2010. Estacionamiento será disponible al norte de la estación. |
HTML |
|
July 22 |
Empezando a las 6 de la mañana el jueves 22 de julio de 2010 hasta completarse la construcción en el verano de 2012, una parte del estacionamiento sur se utilizará para almacenar equipos relacionados a la construcción y trabajo de construcción de la Extensión de Metro Orange Line. |
HTML |
|
March 22 |
As part of the pre-construction activities for the I-405 Sepulveda Pass Improvements Project, the Contractor will conduct a soil stability test near the Getty View Trailhead running along the northbound I-405 freeway between Getty Center Dr and Skirball Center Dr. This work activity is being conducted to survey and monitor the stability of the soil for the future construction of a retaining wall along the I-405 Freeway. Night time work for this activity will require freeway lane closures and ramp closures to facilitate the safe use of excavation equipment. |
HTML |
|
March 22 |
As part of the pre-construction activities for the I-405 Sepulveda Pass Improvements Project, the Contractor will conduct a soil stability test near the Getty View Trailhead running along the northbound I-405 freeway between Getty Center Dr and Skirball Center Dr. This work activity is being conducted to survey and monitor the stability of the soil for the future construction of a retaining wall along the I-405 Freeway. Night time work for this activity will require freeway lane closures and ramp closures to facilitate the safe use of excavation equipment. |
HTML |