Home > Projects & Programs > Construction Notices > I-405 Sepulveda Pass ... > Construction Notice - November 16, ...

Construction Notice - November 16, 2012

ATTENTION RESIDENTS AND BUSINESS OWNERS IN THE VICINITY OF SEPULVEDA BL BETWEEN CHURCH LN/OVADA PL AND GETTY CENTER DRIVE

In preparation for widening of the freeway, drainage systems installation will occur along Sepulveda Bl and in the Caltrans right-of-way, between Church Ln/Ovada Pl and Getty Center Dr.  The installation will occur in phases and will require daytime and nighttime work hours.

What: 

Drainage system installation

Where & When:

Caltrans right-of-way (between Sepulveda Bl and the NB 405):

Location Duration Work hours
Church Ln/Ovada Pl to 250 feet north November 30, 2012 for 7 weeks 7am - 5pm and 8pm - 5am
Moraga Dr on-ramp to 500 feet north November 19, 2012 for 6 weeks 7am - 5pm and 8pm - 5am

Sepulveda Bl:

Location Duration Work hours
Moraga Dr to Bel Terrace November 16, 2012 for 1 week 9am – 5pm

What to expect:

  • Access to residents and businesses will be maintained.
  • Sepulveda Bl traffic will be maintained with one lane in each direction. 
  • Pedestrians will be rerouted to a safe area outside the construction zone.
  • Operation requires demolition of asphalt, installation of soldier piles for support of excavation, excavation, installation of drainage system pipe and inlets.
  • Emergency vehicle access will be maintained.
  • Work is weather permitting and subject to change.

For viewing MS Word, Powerpoint, and Excel documents - Download Adobe Acrobat Reader (free) or use Google Docs Reader (online)