The Eastside Transit Corridor Phase 2 is a transit study looking to connect with and extend the recently opened Gold Line Eastside Extension light rail line, which runs between Union Station in downtown Los Angeles and Pomona, and Atlantic Boulevards in East Los Angeles, to communities farther east. The project’s goals include improving mobility in the study area and planning for future growth in a sustainable manner. The Los Angeles County Metropolitan Transportation Authority (Metro) is leading this study effort in conjunction with the Federal Transit Administration.
Light Rail Transit (LRT) is electric-powered trains that are designed to be integrated into the communities they serve. They generally are the size of articulated buses and up to three cars in length. They function best as a local service with frequent station stops, approximately one mile apart. LRT is not the same as Metrolink or Amtrak trains, which are larger and faster diesel powered trains designed for longer distanced commuting trips.
Federal and state laws require an evaluation of project impacts and identification of mitigation measures. To be eligible to receive both federal and state funds, projects need to comply with the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). Therefore, the Eastside Transit Corridor Phase 2 project will complete both a Draft Environmental Impact Statement/ Environmental Impact Report (Draft EIS/EIR). The public is encouraged to participate in the environmental process and will be notified of public meetings.
The Eastside Phase 2 Draft EIS/EIR document is anticipated to be released for public review in late 2012/early 2013.
Currently, the majority of the Eastside Phase 2 project funding will come from Measure R, the half cent sales tax passed by Los Angeles County voters in November 2008. However, for either LRT alternative, Measure R funds are not sufficient; therefore, Metro is also seeking other funding sources, such as federal, state, and local dollars, to fully construct the project.
For most Metro rail projects in operation, it took over a decade to complete the project development process. By environmentally clearing the project now, Metro will be in a position to take advantage of any funding, federal or otherwise, that might be made available. For example, Metro is aggressively seeking to leverage Measure R funds with the America Fast Forward Initiative. This initiative would accelerate funding for 12 transit projects identified in Measure R, including this project. Rather than building these projects over the course of 30 years, America Fast Forward proposes to build these projects within a decade.
At the beginning of the Alternatives Analysis (AA), 47 build alternatives were identified and screened using federally approved evaluation criteria. In 2009, the Metro Board approved the Alternatives Analysis Study (AA) and the Addendum to the AA, authorizing two light rail alternatives to move forward into the environmental phase, including SR-60 LRT and Washington Bl LRT, in addition to the No Build and Transportation Systems Management Alternatives. These alternatives were selected for further study in the Draft EIS/EIR phase based on technical analysis and public input.
Throughout the course of the environmental study, alternatives have been studied and refined to minimize impacts and maximize their potential benefits. Metro staff will review public comments and the technical evaluation to recommend a Locally Preferred Alternative (LPA) to the Metro Board in 2013.
Not one single criterion is used to select an LPA, but a combination of things. Items such as cost and ridership are important, but so is community acceptance of the project, the ability of the project to support local land use objectives and stimulate economic development, and its impact on the environment.
Metro staff will carefully review the potential impacts and benefits of each alternative, as well as the cost, funding and public input, to make a recommendation to the Metro Board after the Draft EIS/EIR has been circulated for public comment. At that time, the Metro Board may choose to select the LPA, modify the LPA, reject the LPA, direct staff to conduct further studies, or take other actions.
No, Measure R has earmarked $1.27 billion to the Eastside Phase 2 project. Current project estimates to construct the SR 60 LRT is $1.51 billion (in 2008 dollars) and Washington Bl LRT is $1.65 billion, which is not enough for either alternative. Metro will continue to pursue additional funding as the project advances. However, the two alignments being studied are not designed in such a way that would allow them to be built or operated together. In order to construct both alternatives, Metro’s Board would have to authorize additional planning, design, environmental analysis, and funding.
During the Alternatives Analysis (AA) phase of the study, Metro examined 47 alternatives, which included two alternatives that would connect northern cities with southeast cities within the study area. However, these two alternatives had slower travel times, lower ridership, and were not as cost-effective compared to the other alternatives that performed better. Therefore, those two alternatives were dropped from further consideration.
Proposed station locations for both SR-60 and Washington Bl alternatives have been identified, including:
SR – 60 LRT
Washington Bl LRT
Through the environmental phase of the project, station planning will intensify and station area refinements will occur, if needed, based on city and community input as well as engineering and environmental considerations.
Metro considers a wide variety of inputs to determine how a rail project is configured. These include, but are not limited to, the following:
The size and speed of the trains is designed with community integration in mind, including the use of special features like vibration dampening fasteners to secure the rail tracks, which helps minimize noise and vibration around communities.
All light rail transit in Los Angeles County is designed to meet federal and state safety standards. These include stringent seismic codes, Americans with Disabilities Act (ADA) standards, pedestrian design guidelines, parking codes and a host of other safety considerations. Station area platforms will be well lit and have security cameras installed as well as Metro security personnel assigned to ride the system and patrol the station areas for additional safety. All parking and related station area amenities will also be well signed and lit for easy access. In general, LRT is used throughout the world and has proven to be a safe and reliable form of transportation for millions of riders and hundreds of communities.
Yes, some property will be necessary to build the Eastside Phase 2 project. All necessary property will be identified in the Draft EIS/EIR to be publicly circulated in late 2012/early 2013. When purchasing property, Metro will follow federal and state guidelines established to protect property owners and allow a fair and equitable process for everyone.
In short, the project will be constructed when the project studies and engineering are completed and the funding is available. Current Metro funding scenarios show that the majority of local Measure R money could be available starting in 2028. Metro is also exploring the potential of accelerating the project implementation schedule.
Metro’s goal is always to balance the needs of the region with the needs of the local jurisdictions and communities. This can sometimes be challenging, but through careful planning and meaningful public participation, in most cases community support can be achieved. Complete consensus is always difficult to achieve on any project, therefore, the project team is always working toward consensus by engaging the community in meaningful conversation and incorporating public input to the extent possible.
All comments received throughout the study are documented and presented to Metro staff and technical consultants for consideration. In addition, public comments received during the formal scoping period are presented in the appendix of the Draft EIS/EIR document. Comments received during the public review of the Draft EIS/EIR are responded to in the Final EIS/EIR.
The easiest way to stay involved in the study process is to become part of the project database. If you have signed-in at a previous Eastside Phase 2 meeting, then you are automatically included, however, if you would like to be added, then you can simply call the project helpline at 213.922.3012. Over the course of the study, meeting notifications and other project materials will be mailed to the project database to keep interested persons informed of the study developments. In addition, you can also access project information via the web at metro.net/eastsidephase2 or become a fan on Facebook at facebook.com/metroeastsidehphase2.
There were originally 47 alternatives that were identified at the beginning of the Alternatives Analysis Study and eventually narrowed down to two LRT alternatives. Each of the proposed alternatives was screened across federally approved criteria to determine its feasibility. Therefore, each of the remaining LRT alternatives is considered by Metro to be feasible. In the environmental phase, evaluation of impacts will be done to further consider the viability of each alternative, taking into consideration the cost, environmental impacts, and community input.
Metro wants to hear from you. Do you have a question about the study, want more information, or want to be added to our database? You can also contact us about scheduling a presentation for your organization.
Here’s how you can send us your comments, questions or requests:
Project Team:
Laura Cornejo, Project Manager
Tel: 213.922.2885
cornejol@metro.net
Contact Information:
Metro
One Gateway Plaza, M/S 99-22-6
Los Angeles, CA 90012
Comment/Question Form: Complete the form to leave us your questions and comments or be added to our mailing list.
Tel: 213.922.3012
Phone messages are retrieved at least once every business day.
Facebook: Look for our group at
“Metro Eastside Transit Corridor Phase 2”
Twitter:
Metroeastsidephase2
For viewing MS Word, Powerpoint, and Excel documents - Download Adobe Acrobat Reader (free) or use Google Docs Reader (online)