Home > Projects & Programs > Eastside Transit Corridor ... > Alternatives
The SR-60 and Washington Bl proposed alternatives use the same light rail technology (LRT) as the Gold Line Eastside Extension Phase 1, allowing a seamless extension to cities east of the existing Pomona and Atlantic terminus. The following is a detailed description of the two alternatives under consideration:
This proposed alignment generally follows the southern edge of the SR-60 Freeway within the freeway right-of-way, on an elevated track crossing over freeway ramps, and terminates at Peck Rd in the City of South El Monte. The proposed station locations include:
This proposed alignment follows the SR-60 Freeway to Garfield Av, and then travels south to Washington Bl. From there, the alignment continues east and terminates at Lambert Rd in the City of Whittier. This alternative includes both at-grade and elevated sections of track. The proposed station locations include:
Metro wants to hear from you. Do you have a question about the study, want more information, or want to be added to our database? You can also contact us about scheduling a presentation for your organization.
Here’s how you can send us your comments, questions or requests:
Project Team:
Laura Cornejo, Project Manager
Tel: 213.922.2885
cornejol@metro.net
Contact Information:
Metro
One Gateway Plaza, M/S 99-22-6
Los Angeles, CA 90012
Comment/Question Form: Complete the form to leave us your questions and comments or be added to our mailing list.
Tel: 213.922.3012
Phone messages are retrieved at least once every business day.
Facebook: Look for our group at
“Metro Eastside Transit Corridor Phase 2”
Twitter:
Metroeastsidephase2
For viewing MS Word, Powerpoint, and Excel documents - Download Adobe Acrobat Reader (free) or use Google Docs Reader (online)