Lower and plaza level plans of Transportation Building. The driver's patio faces west along Vignes Street. Employees and visitors enter the building from the lower level of the parking garage or from Vignes Street
Second and roof garden level of Transportation Building. The second floor spaces are administrative staff and training room. The roof garden is accessible by the elevator/stair tower for employees.
Ground level and second floor plans of Central Cash Counting Facility.
Ground level plan of Public Fueling Facility. This facility will be accessible by any private citizen requiring alternative fueling means.
Lower level floor plan of the garage. Employees and visitors can access the Transportation and Maintenance buildings at this level.
Ground level floor plan of the garage. This level includes the fueling and washing facility, maintenance bays, and the circulation ramp for access to the upper parking level.
Upper level floor plan of the garage. This level is bus parking; employees can access the Transportation and Maintenance Buildings. The main circulation ramps are at the south side.
The ground level plan of the Maintenance Building. The majority of this space includes repair and preventive maintenance bays, in addition to the tire and body shops. The central core of this building serves maintenance staff and adminstrative functions.
Second level floor plan of the Maintenance Building. This second level spaces are administrative and conferencing functions. The maintenance supervisory staff has access to a interior patio which overlooks the maintenance bays to the north and south.
This vicinity plan shows the relationship of the existing buildings, shown in aqua, to the new additions, shown in orange.