Click here for News & Media informationClick here to view Project & Studies informationClick here to view Business informationClick here to view Metro Store informationClick here to view Metro Career informationClick here to view About Us informationClick here to plan your itinerary on Metro
Click for Service Alerts
 
News and Reports



 
Traffic Reduction Find Out More



Measure R is projected to provide funding for the following projects:

3-A I-5 Capacity Enhancement: SR-134 to SR-170  
3-B I-5 Capacity Enhancement: I-605 to Orange County Line  
3-C I-5/Carmenita Rd Interchange Improvement  
3-D I-5/SR-14 Capacity Enhancement  
3-E I-405, I-110, I-105, SR-91 Ramp/ Interchange Improvements: South Bay  
3-F I-5 North Capacity Enhancements: SR-14 to Kern County Line (Truck Lanes)*  
3-G I-710 South and/or Early Action Projects*
3-H SR-138 Capacity Enhancements
3-I High Desert Corridor (environmental)*
3-J I-605 Corridor “Hot Spot” Interchanges
3-K Highway Operational Improvements in Arroyo Verdugo Subregion
3-L Highway Operational Improvements in Las Virgenes and Malibu Subregion
3-M SR-710 North Gap Closure*

 

3-A I-5 Capacity Enhancement: SR-134 to SR-170
 

Constructs one carpool lane in each direction along the I-5 freeway between SR-134/SR-170, including access improvement for Empire Av.

 
3-B I-5 Capacity Enhancement: I-605 to Orange County Line
 

Constructs one carpool lane and one mixed-flow lane in each direction extending 6.4 miles through Cerritos, La Mirada, Santa Fe Springs and Norwalk. Includes interchange reconstruction and arterial modifications.

 
3-C I-5/Carmenita Rd Interchange Improvement
 

Removes existing two-lane structure and constructs a new eight-lane interchange with carpool lane on-ramps. Project is located in Santa Fe Springs and Norwalk, and could enable widening of I-5 in the area.

 
3-D I-5/SR-14 Capacity Enhancement
 

Provides direct link for carpoolers between I-5 and SR-14 freeways, which eliminates need to exit carpool lanes when switching freeways.

 
3-E I-405, I-110, I-105, SR-91 Ramp/Interchange Improvements: South Bay
 

Constructs improvements in the South Bay to reduce delays on the freeways. Examples include auxiliary lanes and ramp reconfigurations.

 
3-F

I-5 North Capacity Enhancements: SR-14 to Kern County Line (Truck Lanes)*

 

Measure R will add a carpool lane and a dedicated truck lane in both directions on the I-5 freeway north of SR-14 in the Santa Clarita Valley.  It is assumed that partial funding by public/private partnerships will be part of the project plan.

 
3-G I-710 South and/or Early Action Projects*
 

Measure R will improve congestion, safety and air quality by upgrading the freeway and improving truck and traffic flows between the ports of Los Angeles and Long Beach and the SR-60 freeway.  Also to be considered are upgrades to the I-710 Freeway between Pacific Coast Highway and downtown Long Beach.  It is assumed that partial funding by public/private partnerships will be part of the project plan.

 
3-H SR-138 Capacity Enhancements
 

Widens SR-138 by adding new lanes in each direction to the San Bernardino County line.

 
3-I High Desert Corridor (environmental)*
 

Provides the initial study of the High Desert Corridor, linking the Antelope Valley to Apple Valley.

 
3-J I-605 Corridor “Hot Spot” Interchanges
 

Improvements to interchanges along the I-605 corridor, such as at the SR-60, I-5, SR-91 and I-405 interchanges. Examples of improvements include roadway widening, ramp expansion and added signage within the interchange.

 
3-K Highway Operational Improvements in Arroyo Verdugo Subregion
 

Constructs freeway operational enhancements such as ramp improvements, auxiliary lanes and interchange improvements in such areas as Burbank, Glendale and La Canada/Flintridge.

 
3-L Highway Operational Improvements in Las Virgenes and Malibu Subregion
 

Constructs freeway operational improvements such as ramp enhancements, auxiliary lanes and interchange improvements in areas of Agoura Hills, Calabasas, Hidden Hills, Westlake Village and Malibu.

 
3-M SR-710 North Gap Closure*
 

Improvements to connection between SR-710 and I-210 freeways.

  *Partial funding by public/private partnerships is assumed to be part of the project plan.
Copyright © 2008 Metro | Privacy Policy | Metro Employee Access | Search Powered by Google

 

 

 

What's the Plan
What's In My Area
Frequently Asked Questions
Poject Index