| 3-A |
I-5 Capacity Enhancement: SR-134 to SR-170 |
| |
Constructs one carpool lane in each direction along the I-5 freeway between SR-134/SR-170, including access improvement for Empire Av. |
|
|
| 3-B |
I-5 Capacity Enhancement: I-605 to Orange County Line |
| |
Constructs one carpool lane and one mixed-flow lane in each direction extending 6.4 miles through Cerritos, La Mirada, Santa Fe Springs and Norwalk. Includes interchange reconstruction and arterial modifications. |
|
|
| 3-C |
I-5/Carmenita Rd Interchange Improvement |
| |
Removes existing two-lane structure and constructs a new eight-lane interchange with carpool lane on-ramps. Project is located in Santa Fe Springs and Norwalk, and could enable widening of I-5 in the area. |
|
|
| 3-D |
I-5/SR-14 Capacity Enhancement |
| |
Provides direct link for carpoolers between I-5 and SR-14 freeways, which eliminates need to exit carpool lanes when switching freeways. |
|
|
| 3-E |
I-405, I-110, I-105, SR-91 Ramp/Interchange Improvements: South Bay |
| |
Constructs improvements in the South Bay to reduce delays on the freeways. Examples include auxiliary lanes and ramp reconfigurations. |
|
|
| 3-F |
I-5 North Capacity Enhancements: SR-14 to Kern County Line (Truck Lanes)* |
| |
Measure R will add a carpool lane and a dedicated truck lane in both directions on the I-5 freeway north of SR-14 in the Santa Clarita Valley. It is assumed that partial funding by public/private partnerships will be part of the project plan. |
|
|
| 3-G |
I-710 South and/or Early Action Projects* |
| |
Measure R will improve congestion, safety and air quality by upgrading the freeway and improving truck and traffic flows between the ports of Los Angeles and Long Beach and the SR-60 freeway. Also to be considered are upgrades to the I-710 Freeway between Pacific Coast Highway and downtown Long Beach. It is assumed that partial funding by public/private partnerships will be part of the project plan. |
|
|
| 3-H |
SR-138 Capacity Enhancements |
| |
Widens SR-138 by adding new lanes in each direction to the San Bernardino County line. |
|
|
| 3-I |
High Desert Corridor (environmental)* |
| |
Provides the initial study of the High Desert Corridor, linking the Antelope Valley to Apple Valley. |
|
|
| 3-J |
I-605 Corridor “Hot Spot” Interchanges |
| |
Improvements to interchanges along the I-605 corridor, such as at the SR-60, I-5, SR-91 and I-405 interchanges. Examples of improvements include roadway widening, ramp expansion and added signage within the interchange. |
|
|
| 3-K |
Highway Operational Improvements in Arroyo Verdugo Subregion |
| |
Constructs freeway operational enhancements such as ramp improvements, auxiliary lanes and interchange improvements in such areas as Burbank, Glendale and La Canada/Flintridge. |
|
|
| 3-L |
Highway Operational Improvements in Las Virgenes and Malibu Subregion |
| |
Constructs freeway operational improvements such as ramp enhancements, auxiliary lanes and interchange improvements in areas of Agoura Hills, Calabasas, Hidden Hills, Westlake Village and Malibu. |
|
|
| 3-M |
SR-710 North Gap Closure* |
| |
Improvements to connection between SR-710 and I-210 freeways. |
| |
*Partial funding by public/private partnerships is assumed to be part of the project plan. |
|