Metro.net
Riding Metro
News & Media
Projects & Studies
Business Info
Jobs
About Us
Proposed Rail and Rapid Transit Expansion -
Map
Proposed Highway Improvements -
Map
1-A
Exposition Boulevard Light
Rail Transit
1-B
Crenshaw Transit Corridor (project acceleration),
1-C
Regional Connector: Links Local Rail Lines
1-D
Westside Subway Extension
1-H
Green Line Extension to Los Angeles International Airport
1-I
San Fernando Valley North-South Rapidways: Canoga Corridor
(project acceleration)
1-J
San Fernando Valley East North-South Rapidways
(project acceleration)
1-K
West Santa Ana Branch Corridor
1-L
San Fernando Valley I-405
Corridor Connection
1-O
Eastside Light Rail Access
(Gold Line)
3-A
I-5 Capacity Enhancement: SR-134 to SR-170
1-A
Exposition Boulevard Light
Rail Transit
1-C
Regional Connector: Links Local Rail Lines
1-D
Westside Subway Extension
1-C
Regional Connector: Links Local Rail Lines
1-K
West Santa Ana Branch Corridor
3-B
I-5 Capacity Enhancement: I-605 to Orange County Line
3-C
I-5/Carmenita Rd. Interchange Improvement
3-G
SR-710 South and/or Early Action Projects
3-J
I-605 Corridor "Hot Spot" Interchanges
5-C
Burlington Northern Santa Fe (BNSF) Grade Separations in Gateway Cities
1-C
Regional Connector: Links Local Rail Lines
1-E
Gold Line Eastside Extension
1-F
Gold Line Foothill Light Rail
Transit Extension
3-M
SR-710 North Gap Closure (Tunnel)
5-D
Alameda Corridor East Grade Separations Phase II
3-D
I-5/SR-14 Capacity Enhancement
3-F
I-5 North Capacity Enhancements:
SR-14 to Kern County Line
(Truck Lanes)
3-H
SR-138 Capacity Enhancements
3-I
High Desert Corridor (Enviromental)
1-B
Crenshaw Transit Corridor (project acceleration),
1-C
Regional Connector: Links Local Rail Lines
1-G
Green Line Extension: Redondo Beach Station to South Bay Corridor
1-H
Green Line Extension to Los Angeles International Airport
3-E
I-405, I-110, I-105, and SR-91 Ramp and Interchange Improvements: South Bay
3-A
I-5 Capacity Enhancement: SR-134 to SR-170
3-K
Highway Operational Improvements in Arroyo Verdugo Subregion
3-L
Highway Operational Improvements in Las Virgenes and Malibu Subregion
1-M
Metrolink Capital Improvement Projects (Los Angeles County)
1-N
Metro Rail Capital Projects
2-A
Signal Synchronization
2-B
Major Street Resurfacing & Pothole Repair
2-C
Traffic Monitoring Programs
2-D
Bicycle Programs
2-E
Pedestrian Improvement Program
2-F
Safer Bus Stops
2-G
Traffic Demand Management
4-A
Rapid Bus Improvements
4-B
Express Bus Improvements
4-C
Local Bus Improvements
4-D
Improved Service for Seniors
4-E
Improved Service for the Disabled
4-G
Increased Bus Service to Rail Stations
4-H
Expanding Community-based Shuttle Service
5-E
Countywide Soundwall Construction
5-F
Metro and Municipal Regional Clean Fuel Bus Capital Facilities and Rolling Stock
4-F
Fare Equity
5-A
Alternative to High Gas Prices
5-B
Job Stimulus
Copyright © 2008 Metro
|
Privacy Policy
|
Metro Employee Access
| Search Powered by
G
o
o
g
l
e