Home > About Us


Metro is bringing you a better ride


Service improvements and new technology make it easier to Go Metro.
Anytime you board a Metro bus or train, there are thousands of Metro employees working behind the scenes to make sure your experience is the best it can be.



Showing the latest posts relating to: Inside Metro

Artist Ramon Ramirez to sign Pico Rivera posters June 18

Posted by Anna Chen on June 17, 2013 9:06 am
Pico Rivera poster spotted on a Red Line train, part of the Metro Through the Eyes of Artists poster series. Artist Ramon Ramirez will sign free copies of his poster celebrating the City of Pico ...

Artist Mary Kay Wilson to sign Metro ‘San Fernando’ poster at the San Fernando Public Library

Posted by Anna Chen on June 6, 2013 3:36 pm
Swing by the San Fernando Public Library next Tuesday, June 11 to get a free signed copy of the ‘San Fernando’ poster by Mary Kay Wilson. The signing will take place at 10:30 a.m. and ...

Artist Jessica Polzin McCoy to sign Metro ‘Claremont’ poster this Friday

Posted by Anna Chen on May 30, 2013 11:37 am
Artist Jessica Polzin McCoy will sign free copies of her poster celebrating the City of Claremont at 10:30 a.m. on Friday, May 31 at the Claremont Library. Polzin McCoy was commissioned by Metro ...

Metro hosts meeting with mayors

Posted by Jody Litvak on May 15, 2013 8:57 am
One of the seldom seen aspects of Metro’s work is how closely the agency works with all of the cities in Los Angeles County. The coordination covers a broad range of activities such as local ...

Metro’s April ridership numbers are now available

Posted by Steve Hymon on May 14, 2013 4:17 pm
Here are the latest ridership numbers for the Metro bus and rail system. Nothing jumps out at me as big news — it looks like most numbers in recent months are holding steady. In terms of ...

Metro takes second place overall at 2013 International Bus Roadeo

Posted by Anna Chen on May 10, 2013 8:13 am
Metro placed second overall at the 2013 APTA International Bus Roadeo. Photo via APTA. The APTA International Bus Roadeo took place this past weekend from May 3 – 7 in Indianapolis, and Metro ...

Support pole installation on Expo Line completed

Posted by Anna Chen on May 6, 2013 3:41 pm
Click to view slideshow. Photos by Metro This past Saturday, a portion of the Expo Line was shut down so crews could replace the support pole damaged by a wrong-way driver last month. Before the ...

May Service Council meeting previews

Posted by David Hershenson on May 1, 2013 1:30 pm
May Day, May 1, marks the first day of the next round of monthly Service Council meetings, with the San Fernando Valley Council once again starting things off. A wide range of topics will be covered ...

Metro Art rendezvous: May art tours

Posted by Heidi Zeller on April 29, 2013 3:11 pm
Artwork by Sheila Klein at Hollywood/Highland Station. Titled Underground Girl, the artwork frames the station interior as an undulating, organic and sensual space. Metro Art Tours begin at this ...

‘Dreaming’ in full color

Posted by Heidi Zeller on April 22, 2013 12:04 pm
Detail of City of Dreams/River of History before maintenance work. The 80 foot long mural by Richard Wyatt is located in Union Station’s East Portal. View of City of Dreams/River of History ...

View a meeting's agenda in PDF or HTML by clicking on the respective links below. You can also view Transit Information for each meeting by clicking on Transit Info.
Questions / comments directed to the Metro Board of Directors may be sent via e-mail to Office of the Board Secretary.

Meeting & Location Date & Transit Info Agenda
San Fernando Valley Service Council Meeting
Marvin Braude Constituent Service Center
6262 Van Nuys Blvd
Van Nuys
Wednesday, June 5, 2013
6:30 p.m.

Transit Info

HTML
PDF
Google Doc
 
Exposition Metro Line Construction Authority
Kenneth Hahn Hall of Administration
500 W. Temple
Third Floor – Board of Supervisor’s Hearing Room 381B
Los Angeles
Thursday, June 6, 2013
2:30 p.m.

Transit Info

 
Citizens’ Advisory Council Executive Committee Meeting
Metro Board Conference Room
One Gateway Plaza
3rd Floor
Los Angeles
Friday, June 7, 2013
11:30 a.m.

Transit Info

HTML
PDF
Google Doc
 
Advance Transit Vehicle Consortium (ATVC) Reg. Bd Meeting
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Friday, June 7, 2013
2 p.m.

Transit Info

HTML
PDF
Google Doc
 
San Gabriel Valley Service Council Meeting
Metro San Gabriel Valley/Division 9 Building
3449 Santa Anita Avenue
3rd Floor, Service Council Room
El Monte
Monday, June 10, 2013
5 p.m.

Transit Info

HTML
PDF
Google Doc
 
Westside/Central Service Council Meeting
La Cienega Tennis Center-Sunset Room
325 S. La Cienega Blvd.
Beverly Hills
Wednesday, June 12, 2013
5 p.m.

Transit Info

HTML
PDF
Google Doc
 
Metro Gold Line Foothill Extension Construction Authority Regular Board Mtg
Metro Gold Line Foothill Extension Offices Conference Room
406 E. Huntington Drive
Suite 202
Monrovia
Wednesday, June 12, 2013
7 p.m.

Transit Info

 
Gateway Cities Service Council Meeting
Salt Lake Park Community Center, Lounge Room
3401 E. Florence
Huntington Park
Thursday, June 13, 2013
2 p.m.

Transit Info

HTML
PDF
Google Doc
 
South Bay Service Council Meeting
Inglewood City Hall
One Manchester Blvd.
City Hall, Conference Room A
Inglewood
Friday, June 14, 2013
9:30 a.m.

Transit Info

HTML
PDF
Google Doc
 
Southern California Regional Rail Authority (SCRRA) Board Meeting
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Friday, June 14, 2013
10 a.m.

Transit Info

 
Measure R Independent Taxpayers Oversight Committee
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Tuesday, June 18, 2013
10 a.m.

Transit Info

HTML
PDF
Google Doc
 
Finance, Budget, and Audit Committee
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Wednesday, June 19, 2013
12 p.m.

Transit Info

HTML
PDF
Google Doc
 
Planning & Programming Committee
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Wednesday, June 19, 2013
2:30 p.m.

Transit Info

HTML
PDF
Google Doc

Call to Order

Directors

Mark Ridley-Thomas, Chair
Gloria Molina, Vice Chair
Michael D. Antonovich
John Fasana
Mel Wilson
Michael Miles, non-voting member

Officers

Arthur T. Leahy, Chief Executive Officer
Michele Jackson, Board Secretary
Karen Gorman, Ethics Officer
Karen Gorman, Acting Inspector General
County Counsel, General Counsel

12. CONSIDER:

A. approving accepting the updated Long Range Transportation Plan (LRTP) Financial Forecast, including:

1. additional “up to” cost assumptions for the following LRTP programs:

a. State of Good Repair: $750 Million;

b. Accelerated Regional Transportation Improvement Project (ARTI) [Assumes toll based borrowing]: $410 Million;

c. A summary of the use of fund assignment authority delegated to the Chief Executive Officer (CEO);

2. Measure R Project Cost Control Process and Policy compliance recommendations:

a. Crenshaw/LAX (LACMTA funds, base project): $160 Million;

b. Interstate 5 South (LACMTA funds): $153 Million;

c. Interstate 5 South (Excess ROW, State, & Other): $50 Million;

d. Interstate 405 Northbound HOV Lane: $75 Million;

e. Westside Subway Section 1 (LACMTA funds): $73 Million;

f. Regional Connector (LACMTA funds): $32 Million;

g. Exposition Ph. 1 (LACMTA funds, Expo. Auth. costs): $32 Million;

h. Exposition Ph. 1 (LACMTA funds and costs): $7 Million.

(CARRIED OVER FROM MAY COMMITTEE CYCLE)

(ALSO ON FINANCE, BUDGET AND AUDIT COMMITTEE)

73. VILLARAIGOSA, KATZ AND WILSON MOTION that the MTA Board of Directors adopt and direct the CEO to do the following:

A. adopt as policy a rail alignment alternative that connects the existing Crenshaw/LAX and Green Line alignments to the ITF;

B. include the rail ITF connection to the Airport Metro Connector Environmental Impact Report & Study (EIR/EIS); and authorize up to $600,000 in Airport Measure R 35% funds;

C. determine construction cost of project as described above;

D. conduct a modeling/ridership analysis to determine passenger and employee ridership in coordination with LAWA;

E. explore and recommend a financial plan to fully fund the Airport Metro Connector which includes but is not limited to the following sources:

1. eligible airport revenues

2. federal Transit Administration and/or Federal Aviation Administration eligible funds;

3. Transit Oriented Development & Property leases

4. Public Private Partnerships

F. by the September 2013 Board Meeting, incorporation with LAWA, transmit to Federal Aviation Administration a formal request to allow initiation of the EIS/EIR and report to the Board in October 2013 the results of this request.

22. CONSIDER:

A. allowing the County to receive Measure R equity funds;

B. requiring the cities of Burbank, Glendale, La Canada Flintridge, and the County of Los Angeles to jointly develop a recommended project list for future programming years that will allow the County to "catch up" with its population share of the Arroyo Verdugo Subregion Highway Operational Funds; and

C. requiring all other subregions that receive Highway Operational Funds to continue developing future recommended projects using the need-based, instead of population-based, methodology.

(CARRIED OVER FROM APRIL COMMITTEE CYCLE)

23. AUTHORIZE the Chief Executive Officer to:

A. negotiate the integration of the Willowbrook/Rosa Parks Station, formerly known as Imperial/Wilmington/Rosa Parks Station, within an adjacent parcel owned by the Los Angeles County Community Development Commission (Commission), including the potential purchase of part of the parcel, contingent on availability of funds; and

B. approve Contract Modification Authority specific to Contract No. PS4320-2763, Rosa Parks Transit Station Improvement and Transit Oriented District Integration Professional A&E Services, with Jenkins/Gales and Martinez, Inc. (JGM) in the amount of $500,000 for a total contract value of $799,006 to refine the design of a Metro facility and associated station improvements.

24. APPROVE updated Measure R I-710 Early Action Project List.

72. VILLARAIGOSA, MOLINA, NAJARIAN AND WILSON MOTION that the MTA Board of Directors direct the CEO to use the following framework in order to create an “open streets” program:

A. identify an eligible source of funds to allocate annually up to $2 million to support the planning, coordination, promotion and other related organizational costs;

B. report back at the September 2013 Board meeting a recommended competitive process and program, working with the County Council of Governments and other interested cities, to implement and fund a series of regional “open streets” event throughout Los Angeles County; and

C. develop a technical process to collect data and evaluate the cost and benefits (e.g. transit use increases, reduction of air emissions, etc.) of these events.

25. AUTHORIZE the Chief Executive Officer (CEO) to:

A. execute modification No. 6 to Contract No. PS4320-2006 with Arellano Associates to provide outreach services for the Eastside Phase 2 Draft Environmental Impact Statement/Report (DEIS/R) for an additional term of nine months in the firm-fixed price of $105,254, increasing the total contract value from $1,933,771 to $2,039,025; and

B. increase the Contract Modification Authority specific to Contract No. PS4320-2006, Eastside Phase 2 Outreach, with Arellano Associates in the amount of $100,000.

 26. UPDATE on Countywide HOV Lane System/Performance.

27. CONSIDER:

A. approving a Model Construction Relations Program that has been deployed in support of all major transit projects commencing with the Orange Line; and

B. providing clear agency guidelines to aid in managing public expectations for the scope and breadth of project activities that may be conducted to address the rigors and impacts of construction as the projects proceed.

(ALSO ON CONSTRUCTION COMMITTEE)

(CARRIED OVER FROM MAY COMMITTEE CYCLE)

28. RECEIVE AND FILE review of business assistance programs.

(ALSO ON CONSTRUCTION COMMITTEE)

(CARRIED OVER FROM MAY COMMITTEE CYCLE)

29. APPROVE the preliminary project funding strategy for the 2013 Countywide Call for Projects.

30. RECEIVE AND FILE update on the Los Angeles County Bus Rapid Transit and Street Design Improvement Study.

31. RECEIVE AND FILE report responding to the March 28, 2013 Board motion directing the Chief Executive Officer to formally recognize and staff to report back to the Board in 90 days with specific information on the five San Fernando Valley Council of Governments transportation priorities.

32. RECEIVE AND FILE report on the implementation progress on the May 2013 Board Motion to increase Metrolink weekend service on the Antelope Valley Line.

33. RECEIVE the Regional Rail Update through May 2013.

34. RECEIVE oral report on Highway Program Project Budget and Schedule Status.

35. RECEIVE report of the Chief Executive Officer.

Consideration of items not on the posted agenda, including: items to be presented and (if requested) referred to staff; items to be placed on the agenda for action at a future meeting of the Committee or Board; and/or items requiring immediate action because of an emergency situation or where the need to take immediate action came to the attention of the Committee subsequent to the posting of the agenda.

COMMENTS FROM THE PUBLIC ON ITEMS OF PUBLIC INTEREST WITHIN COMMITTEE’S SUBJECT MATTER JURISDICTION

ADJOURNMENT

 
System Safety and Operations Committee
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Thursday, June 20, 2013
9 a.m.

Transit Info

HTML
PDF
Google Doc
 
Construction Committee
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Thursday, June 20, 2013
10:15 a.m.

Transit Info

HTML
PDF
Google Doc
 
Executive Management and Audit Committee
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Thursday, June 20, 2013
11:30 a.m.

Transit Info

HTML
PDF
Google Doc
 
Ad-Hoc Sustainability Committee
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Wednesday, June 26, 2013
10 a.m.

Transit Info

 
Metro Gold Line Foothill Extension Construction Authority Regular Board Mtg
Metro Gold Line Foothill Extension Offices Conference Room
406 E. Huntington Drive
Suite 202
Monrovia
Wednesday, June 26, 2013
7 p.m.

Transit Info

 
Measure R Public Meeting
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Thursday, June 27, 2013
9 a.m.

Transit Info

HTML
PDF
Google Doc
 
Regular Board Meeting
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Thursday, June 27, 2013
9 a.m.

Transit Info

 
Fare Change (Youth on the Move) Public Hearing**
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Thursday, June 27, 2013
9 a.m.

Transit Info

**Held in conjunction with the MTA Regular Board Meeting

 
Measure R Public Meeting**
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Thursday, June 27, 2013
9 a.m.

Transit Info

HTML
PDF
Google Doc

**Held in conjunction with the MTA Regular Board Meeting

 
SCRRA Special Board Meeting
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Friday, June 28, 2013
9 a.m.

Transit Info

 
SCRRA Safety and Operations Committee Meeting
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Friday, June 28, 2013
10 a.m.

Transit Info

 
SCRRA Planning and Finance Committee Meeting
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Friday, June 28, 2013
10 a.m.

Transit Info

 
SCRRA Executive Management & Audit Committee Meeting
Metro Board Room
One Gateway Plaza, 3rd Floor
Los Angeles
Friday, June 28, 2013
10:30 a.m.

Transit Info

 

View a meeting's agenda in PDF or HTML by clicking on the respective links below. You can also view Transit Information to each meeting by clicking on Transit Info.

Meeting & Location Date & Transit Info Agenda





For viewing MS Word, Powerpoint, and Excel documents - Download Adobe Acrobat Reader (free) or use Google Docs Reader (online)

TRANSIT INFO: 323.GO.METRO (323.466.3876) STAY CONNECTED: